-

-

Sunday 20 March 2016

Phase 3 : Designing Happiness

"Highway Break"

Context Interfaces

Bangkok highway plan
Showing traffic period on each specific highway spots

Rama3 highway axon
The project can be flexible by the floor level, one is taller and one is shorter, depends on the program needed


Schematic drawing, Circulation
This building is not just a break from the traffic but also serve as a uturn as the existing one does not provide


Schematic drawing, Floor plan
The possibility of programs that could be arrange

Schematic drawing, Section
All structure would be prefabricated for faster construction and increasing of the floor level for later

Perspective view

No comments:

Post a Comment